Precision steel panels, ready to build. CFS ProFrame — Panelized Cold-Formed Steel Framing

Panelized cold-formed steel framing for developers, builders and contractors who need faster, more predictable framing.

Built for your next development

Panelized CFS for a wide range of projects

Multifamily project framed with cold-formed steel
MultifamilyMid-rise apartments and mixed-use
Townhomes project framed with cold-formed steel
TownhomesRepeatable plans, fast cycles
Hospitality project framed with cold-formed steel
HospitalityHotels on tight opening dates
Senior living project framed with cold-formed steel
Senior livingNon-combustible and quiet
Light commercial project framed with cold-formed steel
Light commercialRetail and offices
The Question

Wood framing — or a predictable path to steel?

Every project eventually asks the same question: will this framing hold its schedule, its budget and its tolerances all the way to closeout? Panelized cold-formed steel (CFS) is a practical path for projects that need durability, precision and scalability — without reinventing how the building is designed.

If your plans are currently wood-framed, we can assist with conversion, engineering and a side-by-side quote — so the decision is based on real numbers, not assumptions.

Cold-formed steel wall panel being lifted by crane into place on site

Dimensional Stability

Stays straight. Reduces warping, shrinkage and callbacks — no curved studs.

Non-Combustibility

Won't burn. Helps improve life safety and code performance (ASTM E136).

Factory Precision

Engineered and manufactured in a controlled environment for faster, cleaner installs.

Repeatability at Scale

Standardized, panelized systems deliver predictable schedules across multiple projects.

Total Cost

Judge it on total cost, not just the quote.

Construction, financing, insurance and operations — framing choice affects every line.

Already building in steel?

We'll compare quotes for cost savings — it is not Chinese steel. Our material is 100% U.S. melted & poured, backed by mill certs for every lot.

Lower insurance exposure, fewer callbacks, less waste, and no haul-off fees add up over the life of the building — not just at framing.

CFS ProFrame panelized cold-formed steel framing, low-rise multifamily project
Schedule

Manufactured around your schedule.

Production and delivery aligned with phased construction needs — so framing stops being the bottleneck.

1 mile / shiftLinear feet of panelized product per 8-hour shift, per machine
4–5 weeksProduction time for a 52,000 SF structure
7 daysOn-site assembly for a 5,000 SF structure
01
Project Review

We review plans, schedule and site logistics to align on scope, phasing and delivery timing.

02
Production Planning

A detailed production plan sequences panels to match your construction schedule.

03
Phased Fabrication

Panels are fabricated in phases, clearly labeled and bundled by building, level and sequence.

04
Organized Delivery

Panels are loaded and delivered in the order needed on site, with clear labeling and documentation.

05
Installation Sequence

Panels arrive in install sequence, helping crews set faster with fewer handling steps.

Panelized cold-formed steel bundles loaded on a truck in install order
Insurance & Lifecycle Cost

A material that lowers risk, not just cost.

Non-combustibility and dimensional stability aren't just technical specs — they show up directly on an insurance line and in fewer calls back to the jobsite.

Non-Combustible (ASTM E136)

A strong case for lower insurance premiums and fewer podium construction constraints at 5+ stories.

No Rot, Warp, Termites or Shrinkage

Fewer callbacks after occupancy. Straight walls, no curved studs, no saltwater or moisture degradation.

Low Waste, Fast Assembly

Pre-cut, pre-drilled and pre-measured to your MEP plan — no sawing, no haul-off fees, no field measuring mistakes.

Compare

Wood framing vs. panelized CFS

A direct, side-by-side look at what changes when you switch systems.

Wood stick framing
Wood stick framing
CFS ProFrame panelized steel framing
CFS ProFrame panelized steel
FactorWood FramingPanelized CFS
Dimensional stabilityCan warp, shrink, bow over timeStays straight — no field warping
CombustibilityCombustible materialNon-combustible (ASTM E136)
Pests & moistureVulnerable to termites, rot, moldResistant to termites, rot, saltwater corrosion
Manufacturing precisionField-cut, variable tolerancesFactory roll-formed, tight tolerances
Jobsite wasteCut-offs, haul-off feesPre-cut, pre-measured — minimal waste
MEP coordinationField drilling/notching requiredPre-drilled to your MEP plan
Schedule predictabilityExposed to weather delaysOff-site fabrication, coordinated delivery
AssemblyMeasuring, cutting, nailingLabeled, sequential, self-tapping screws
Steel origin—100% U.S. melted & poured, not imported Chinese steel
Panelize

One complete structural package.

Riveted, pre-panelized steel frame material arrives at your jobsite clearly labeled and ready for the crew to unload in sequential order and assemble with self-tapping screws.

We supply as much — or as little — as your project requires: trusses, joists, and wall unit components, or a full turnkey package.

Factory-built cold-formed steel wall panel with labeled tag at the CFS ProFrame plant
Load-bearing wall panels

Load-Bearing Wall Panels

Engineered wall panels that carry structural loads and resist lateral forces.

Non-load-bearing wall panels

Non-Load-Bearing Panels

Cost-effective, precision-fabricated panels for interior and exterior partitions.

Floor framing

Floor Framing

Lightweight, high-strength floor systems for residential, commercial and mixed-use.

Roof trusses

Roof Trusses

Custom-engineered, cold-formed steel trusses for efficient, durable roofing.

Components and bracing

Structural Bracing

A complete range of components and bracing for strength, stability and code compliance.

Pre-Drilled for MEP

Measured for electrical, plumbing and HVAC straight from your MEP plan — no field surprises.

Labeled & Sequenced

Each panel is clearly tagged for fast, accurate identification and installation.

Reduced Labor Hours

Panels go up instead of being stick-framed in the field — smaller crews, faster cycle time.

Compliance & Engineering

Built to code, engineered end to end.

Digital coordination from drawings to fabrication — designed to IBC and AISI standards on FrameCad design and roll-forming technology.

FRAMECAD workflow

FrameCad Workflow

Modeled, detailed and produced directly in FrameCad for speed, accuracy and consistency.

Structural calculations

Structural Calculations

Code-compliant engineering for wind, seismic and gravity loads, tailored to each project and jurisdiction.

Panel drawings

Panel Drawings

Detailed, fabrication-ready panel drawings with dimensions, member profiles and labeling.

Assembly drawings

Assembly Drawings

Clear assembly drawings and details for fast, accurate jobsite installation.

3D BIM coordination

3D / BIM Coordination

3D models and BIM coordination with architectural, structural and MEP trades to reduce clashes.

IBC + AISICode-compliant structural design
PE-StampedCalculations & shop drawings sealed by a licensed engineer
Mill CertsLot-by-lot proof of U.S. steel origin
Systems & Process

From drawings to jobsite delivery.

A clear, seven-step process from concept to execution — so you always know where your project stands.

1
Project Review

We review your drawings, scope and schedule to align on project goals.

2
Quotation

Receive a detailed, competitive quote with clear scope, pricing and lead times.

3
Engineering

Our team produces shop drawings and engineering for manufacture and erection.

4
Fabrication

Precision fabrication in a controlled facility using advanced equipment and proven processes.

5
Quality Control

Rigorous quality checks ensure every component meets specifications and our standards.

6
Delivery

Careful logistics and on-time delivery get your materials to the jobsite when you need them.

7
Field Support

Our team is available for installation support to help keep your project on track to completion.

Erection Guidance

Clear sequencing, best practices and on-site guidance to keep crews productive.

Installation Documents

Detailed, code-aligned drawings and installation resources tailored to every project.

First-Project Support

Hands-on support for your first project to ensure a smooth, successful experience.

See It In Action

From the plant to a standing wall.

Two short walkthroughs — how panels move from fabrication to your jobsite, and how a crew sets them once they arrive.

Plant to Jobsite

Panelized cold-formed steel framing — engineered and factory-built, from the production floor to a standing frame.

Panel Installation Guide for Builders

From the truck to standing walls — a simple, fast, clean look at crew assembly on site.

Frequently Asked Questions

Cold-formed steel framing, explained.

Straight answers for builders and developers evaluating panelized CFS for the first time.

What is cold-formed steel (CFS) framing?

Roll-formed, factory-built steel wall panels, floor systems and roof trusses in place of wood studs — engineered to your architectural plans, pre-cut and pre-drilled for MEP, and delivered labeled in install order for self-tapping-screw assembly.

Is panelized CFS cheaper than wood framing?

The framing quote is only part of it. CFS typically lowers total cost of ownership through reduced insurance exposure, less jobsite waste, fewer callbacks, and reduced field labor hours versus stick-framed wood.

Is cold-formed steel non-combustible?

Yes — non-combustible per ASTM E136, supporting lower insurance premiums and fewer podium-construction constraints on multi-story buildings versus combustible wood framing.

How fast can panels be delivered to a jobsite?

Production is phased to match your construction schedule. As a reference point: a 52,000 SF structure typically takes 4-5 weeks to produce, and a 5,000 SF structure can be assembled on site in about 7 days.

Does CFS ProFrame use Chinese steel?

No. Material is 100% U.S. melted and poured steel, backed by mill certificates for every lot.

Wood framing vs. panelized CFS — what actually changes?

Wood is field-cut and can warp, shrink or attract termites. Panelized CFS is factory roll-formed to tight tolerances, stays dimensionally straight, resists pests and moisture, and arrives pre-drilled for MEP with minimal jobsite waste.

Let's build your next project

Still framing in wood?Let us bid your next project in steel!

Send your plans and get a side-by-side total-cost comparison, wood vs. steel. No cost. No commitment.

What we need to quote

1Construction drawings
2Project location
3Size and number of stories
4Framing schedule
5Scope: panels or panels + install